1. Main Category: Project Initiation (Level 1 - Numbered)
I. Phase One Preparation (Level 2 - Uppercase Roman)
a. Stakeholder Requirements Gathering (Level 3 - Lowercase Alphabet)
• Schedule kickoff meeting with the core team (Level 4 - Bullet Point)
- Confirm availability of all product owners (Level 5 - Hyphen/Sub-bullet)
• Review initial technical constraints documentation (Level 4 - Bullet Point)
b. Resource Budget and Allocations (Level 3 - Lowercase Alphabet)
II. Phase Two Execution Blueprint (Level 2 - Uppercase Roman)
2. Main Category: System Integration (Level 1 - Numbered)